Skip to content

Building Waterproofing CAD Details

Below Grade Wall on Mat Slab Foundation Over Working Slab

Below Grade Wall on Footing with Interior Floor Elevated Above Footing

Expansion Joint on Raised Curb at Wall

Expansion Joint on Below Grade Wall

Above Grade Wall with Masonry Cladding and Below Grade Brick Shelf

Plaza Slab Over Below Grade Wall

Plaza Planter with Waterproofing Beneath Planter Wall

Pipe Penetration in Below Grade Wall with Reinforcement Flashing

Door Threshhold at Plaza

Door Threshhold at Plaza Alternative Method

Below Grade Wall at Edge of Mat Slab Foundation Over Working Slab

Plaza Drain with Pavers – Drain Covers

Plaza Drain with Pavers

Plaza Drain with Concrete Topping Slab

Plaza Drain with Bricks

Pipe Penetration in Plaza Area

Pipe Penetration In Plaza Area – Alternative Method

Mechanical Curb Flashing

Hyproof GL Over Existing Coal Tar

Typical Plaza Deck Assembly New or Clean Deck

Below Grade Wall on Footing Interior View

Below Grade Wall Approved Membrane Placement

Below Grade Wall on Footing

Below Grade Wall on Footing with Elevated Interior Floor Slab

Above Grade Wall with Masonry Cladding and Brick Shelf

Below Grade Wall on Footing Exterior View

Door Threshold for Plaza

Tie-In of Hyproof GL to Existing Coal Tar Waterproofing System

Re-Cover of Existing Coal Tar Waterproofing System

Back To Top